Boat Thruster Guide

What to buy, what it costs, what it takes to fit

We may earn a referral commission from some links on this page. It doesn't change your price or our recommendations.

Thruster specs

Sleipner SEP50/140S: specs, price and the boats it fits

The SEP50 is the PRO version of the 140 mm SE50: up to 137 lb of push for boats of about 26 to 36 ft, with the joystick setting how hard it pushes. It comes at 12 or 24 V.

Imtra lists the 12 V kit at $5,350, before a separate tariff line, and no price for the 24 V one. Around it you need a panel, a main switch and a fuse, about $558 to $1,234. At 12 V the manual gives 370 A and an ANL 325 fuse. The parts list.

Flat out the motor runs 2 to 3 minutes at a time; at lower speeds the controller lets it run longer. The manual prints 40 kg beside 110 lb at 10.5 V, and 110 lb is the 50 kg the page gives. Warranty: two years.

Fitting it yourself? The installer section has every spec, and the Sleipner (Side-Power) review sets this model against the rest of the Sleipner range.

Where this summary comes from (5 sources, read 15 October 2026)

Key facts

  • DIY level 2 of 5 Wiring prep only
  • Thrust 137 lb 62 kgf, Sleipner's rating
  • Boat length 26 to 36 ft Sleipner's own range
  • Price $5,350 full kit, imtra.com, 15 October 2026
  • Fitted by a yard $12,249 to $14,834 Our estimate at 35 ft, unit and job
  • Voltage 12 V or 24 V As sold
  • Mounts Tunnel Fixed mount, bow or stern
  • To fit it Haul-out The boat comes out of the water
  • Run limit 2 to 3 min Duty cycle at 20 C ambient

Every figure here is the maker’s or a dealer’s, except the fitted cost, which is our estimate. The full spec sheet is further down.

How much of the install is yours

DIY 2 of 5: Wiring prep only. The yard fits the unit and does the hull work; you do the wiring prep.

DIY levels

  • Level 5: Owner install. No yard, no electrician.
  • Level 4: You fit it, electrician connects. You mount and wire it; a marine electrician makes the final connections.
  • Level 3: Split with the yard. The yard does the below-waterline part; you do the wiring.
  • Level 2: Wiring prep only. The yard fits the unit and does the hull work; you do the wiring prep.
  • Level 1: Yard job. A qualified professional does all of it.

You Yard Electrician. The bar is labor hours; a haul-out is a note.

How we rate DIY

You: 4 to 16 h Yard: 32 to 70 h Electrician: 2 to 4 h Plus a haul-out.

  1. Cut, bond and fair the tunnel; fit the gear leg, motor and propeller Yard 32 to 70 h The low end is two crew over two days, the job as owners describe it on the forums. The high end rises with boat length between two real billed figures: 32 hours at 35 ft, and the largest invoice we hold, 70 hours at 47 ft.
  2. Mount the battery box, switch and fuse holder; run and secure the cables You 4 to 16 h Our estimate. No maker times this step, and a first-time owner is slower than a yard, so the range is wide.
  3. Final connections at the battery and the motor, load test Electrician 2 to 4 h Our estimate. Nobody publishes a time for the final connections and test on their own.

Your part needs:Heavy battery cableCrimping big lugs

A qualified marine electrician should make the final connections and test them before first use. Hours are labor only.

Is it right for your boat?

What Sleipner says 26 to 36 ft The maker's own range, from its listing
What our sizing says 39 ft Full thrust in 15 knots. The longest boat of each kind is in the table.

Our figure is the longest boat one unit can steer in a 15 knot wind. It is a range because each kind of boat catches the wind differently. Here every kind of boat it fits gets full thrust to 39 ft. The maker gives one range for every boat.

The table below tries the Sleipner SEP50/140S on each kind of boat, at every length that kind of boat is built in. The wind is 15 knots and the rules are the finder’s own. A length counts as a fit when the unit gives the thrust that boat needs at the bow and the maker lists it for that length.

A boat up to 10 percent past the maker’s range still counts here, as it does in the finder. So the table runs up to 39 ft, just past Sleipner’s own range (26 to 36 ft).

The Sleipner SEP50/140S against each kind of boat, in a 15 knot wind. Our sizing, from the finder’s own rules.
Boat Full thrust at 15 knotsStill a fit, in lighter wind
Pontoon & tritoon Not listed. A pontoon has no hull body between the logs to bore a tunnel through, and nobody sells one for these boats.
Sailboat 33 to 39 ft None
Houseboat None 30 to 39 ftfull thrust to about 11 knots at 39 ft
Catamaran 38 to 39 ft None
Trawler 33 to 39 ft None
Motor yacht 35 to 39 ft None
Bass & flats Not listed. Nobody sells a tunnel kit for these hulls, and a bass boat’s shallow planing bow has almost no depth to hold one.
Wake & ski boats Not listed. Nobody sells a tunnel kit for these hulls.
Express cruiser No length. More thrust than the boat needs.
Center console No length. More thrust than the boat needs.

Reading the two length columns. The first column is where one unit gives all the thrust the boat needs in 15 knots. The second is where the finder still lists it: the unit falls short of what the boat needs by no more than 10 percent, and gives the whole figure only in the lighter wind named. On a boat shorter than the first column’s shortest length, the unit is more than the boat needs.

It is sized for five kinds of boat here. For your own boat, the finder gives an answer that also counts your drive and who does the fitting. The compare page sets this unit beside others.

What it costs fitted

These totals are our estimate of a yard job: the unit’s price, plus a yard’s hours at $160 to $180 an hour, plus the batteries, cable and charger, plus the other parts the box does not hold. A Lifting the boat out of the water on a travel lift or a trailer so work can be done below the waterline. It is billed separately from the job itself. adds $540 to $1,880 at these lengths, with 5 to 7 days out of the water, worked from eight yards’ own rate cards. The hours come from what owners and yards report. Your own yard will have its own opinion. The cost page builds the same figures line by line.

The Sleipner SEP50/140S fitted by a yard, from the shortest to the longest boat it is sized for. Our estimate.
Boat length The unit Yard labor Haul-out Batteries, cable, charger Other parts Total
30 ft $5,350 $5,120 to $5,760about 32 hours $540 to $1,450 $601 to $800 $558 to $1,234 $12,169 to $14,594
35 ft $5,350 $5,120 to $5,760about 32 hours $620 to $1,690 $601 to $800 $558 to $1,234 $12,249 to $14,834
39 ft $5,350 $5,120 to $8,10032 to 45 hours $700 to $1,880 $601 to $800 $558 to $1,234 $12,329 to $17,364

How the batteries, cable and charger add up. We price a battery bank close to the thruster, as the makers recommend, with 10 to 20 ft of cable out and back: red for the positive, black for the negative, cut to length. The low end is the cheapest battery that meets the figure and the shorter run; the high end is a sealed (AGM) battery and the longer run. The charger is a NOCO GEN5X2 two-bank shore charger.

Batteries and lugs are priced at Fisheries Supply and the cable and charger at Defender, read 12 October 2026.

  • At 12 V: one 12 V battery, at least 665 CCA (Sleipner’s minimum), $360 for the battery; Sleipner’s cable table gives 1/0 AWG: $95 to $171 for the red and black cable and the lugs; a GEN5X2 charger, $146.
  • At 24 V: two 12 V batteries in series, at least 332 CCA each (Sleipner’s minimum), $513 for both; Sleipner’s cable table gives 3 AWG, priced on 1 AWG, the nearest size cut to length: $80 to $141 for the red and black cable and the lugs; a GEN5X2 charger, $146.

The sizing and the costs on this page are estimates, for guidance only and without warranty. They are no quote, and nobody has inspected your boat. Check them against the maker’s manual and your yard before you rely on them. Terms of use.

What else you buy

What follows comes from Sleipner’s SE80 to SE150 installation guide, document 2687 rev 30, 2025, read 30 September 2026.

In the box
The gasket, bolts and anode come with the unit. The SEP guides call the power controller "the included PPC unit".
Bought separately
The ANL fuse and a main switch ("must include"), the control panel with its own guide, the panel cable, the tunnel and the cable.
Charging
The word "charging" is not in any of the Sleipner guides we read. The battery is sized by cold cranking amps, and a battery near the thruster is suggested. How it gets charged is left to you and your installer.

The manual’s words, page 19: “For installations on large vessels with bow and stern thrusters or catamarans a dedicated battery for each thruster should be considered.”

The “other parts” line in the estimate above is the priced parts below, $558 to $1,234 at Fisheries Supply’s prices on 30 September 2026. The batteries, cable and charger have a line of their own.

Parts the Sleipner SEP50/140S’s box leaves to you, from the makers’ manuals read 30 September 2026. “What to ask for” is Sleipner’s own part or model where its manual names one, otherwise the dealer’s item.
Part What it is What to ask for Dealer price
Tunnel tube The fiberglass, aluminum or steel pipe the thruster sits in, bonded through the bow. Sleipner names none $221–$419140 mm fiberglass tunnel tubes up to 60 in (1.5 m) long (Lewmar), at Fisheries Supply, read 16 October 2026.
Control panel The buttons or joystick at the helm. One helm, one panel: a second steering station needs a panel of its own. SM8960G single joystick, SM8950G touch panel $219–$374Side-Power touch panel and single joystick, VETUS push-button panel, Lewmar single joystick, at Fisheries Supply.
Control cable, panel to motor The thin cable from the helm to the motor. Sold by length. Side-Power 4-wire control cable, by length $29–$173Side-Power control cables, VETUS panel cables, Lewmar Gen 2 connecting cables, at Fisheries Supply.
Main fuse A slow-blow fuse of the ANL type at the battery, in the size the maker prints for the model. Side-Power ANL fuse, the rating in the yard table below $18–$57Side-Power ANL fuses, Blue Sea ANL fuses, at Fisheries Supply, read 16 October 2026.
Fuse holder The block the ANL fuse bolts into, with a cover. SMANLHOLD (SMANLHOLD-C with a cover) $27–$93Egis and Blue Sea ANL fuse blocks, Side-Power ANL fuse holders, at Fisheries Supply, read 16 October 2026.
Main battery switch The switch that cuts the thruster off from its battery when you leave the boat. Side-Power manual main switch, 350 or 600 A, or the automatic AMS $35–$107Egis m-Series 300 A, Blue Sea e-Series 350 A and HD-Series 600 A on/off switches, at Fisheries Supply, read 16 October 2026.
Control-circuit fuse and switch A small fuse, and often a switch, on the thin wire that powers the panel or control box. Sleipner names none $8–$12Blue Sea in-line ATO fuse holders, at Fisheries Supply, read 16 October 2026.
Battery cable and lugs The two heavy cables from the battery to the motor, sized to the length of the run. The wiring calculator sizes them. Sleipner names none In the electrical line
Battery bank A cranking-type bank near the motor, sized by the maker's cold cranking amps. The battery calculator checks it. Sleipner names none In the electrical line
Charger or charge feed How the thruster bank gets charged: a shore charger of its own, a DC-to-DC charger or charging relay from the boat's system, or a charger built into the unit. Sleipner names none $146–$305NOCO GEN5X2 shore charger, Victron Orion-Tr Smart DC-DC charger, Blue Sea ML-ACR charging relay, at Fisheries Supply.
Glass, resin, filler and sealant What bonds the tube or housing into the hull and seals the gear leg. Sleipner names none Not priced

The cost page has the whole list with what every maker says about each part.

For the yard and the installer

The full spec sheet, grouped the way a yard reads it. Every figure is the maker’s or a dealer’s, with its source.

The Sleipner SEP50/140S, every published figure the site holds, with where each came from.
Thrust and motor
Thrust 137 lb (62 kgf) As printed: at 12V: 62kg; at 10.5V (nominal): 50kg
Thrust under load110 lb at 10.5 V
Motor2.4 kW
Voltage12 V or 24 V
Fitting
TypeTunnel, fixed mount
End of the boatBow or stern
Tunnel diameter140 mm
What it does to the hullTunnel bore below the waterline
Haul-out to fit itYes
Maker’s boat length26 to 36 ft
The tunnel
Tunnel length Avoid a tunnel longer than four times its diameter. Friction inside a long tube slows the water and cuts thrust. Too short, and the flow reaches the propeller before it has straightened, which the manual says causes cavitation and noise. The propeller must sit entirely inside the tube. Sleipner’s installation manual
Depth below the waterline As deep as possible under the waterline, and as far forward as possible. The depth for a given model is in that model’s own measurements. Deeper prevents air being sucked in from the surface and raises the water pressure at the propeller. SE20 to SE40 installation guide, 5611 rev 25 (2025)
Price and ordering
Price $5,350 full kit, a dealer's price, imtra.com, 15 October 2026
Part number SEP50/140S-12V12 V, 12 V DC (nominal 10.5 V DC)
SEP50/140S-24V24 V, 24 V DC (nominal 21 V DC)
Documents
Manual Installation manualon the maker's product page
Warranty Sleipner gives 2 years for leisure use and 1 for commercial use. It transfers to the next owner, and it starts no later than 18 months after the boat's first launch. Sleipner's warranty statement, effective 1 April 2022
The site’s reviewSleipner (Side-Power) review

Draw, cable, fuse and battery, at each voltage

These are the maker’s own figures, at each voltage it is sold at. The cable is the size for the shortest run in the maker’s table. A longer run may need heavier cable, and the wiring calculator works that out for your own boat.

The Sleipner SEP50/140S’s draw, cable, fuse, battery and run limit, as the maker publishes them.
Voltage Draw Maker’s cable Fuse Battery Run limit
12 V 370 Anominal draw 1/0 AWG for up to 22 ft of cable counted out and back. Longer runs take heavier cableinstallation guide ANL 325installation guide 350 CCA DIN minimumSleipner installation guide, SEP50, document 4522 rev 22 (2025) 2 to 3 min duty cycle at 20 C ambientproduct page, "Motor cycle duty"
24 V 170 Anominal draw 3 AWG for up to 22 ft of cable counted out and back. Longer runs take heavier cableinstallation guide ANL 150installation guide 175 CCA DIN minimumSleipner installation guide, SEP50, document 4522 rev 22 (2025) 2 to 3 min duty cycle at 20 C ambientproduct page, "Motor cycle duty"

What holds up and what to weigh

Each point names the fact it rests on.

What holds up

  • Sleipner sells it for either end, so it can go at the bow or the stern.The maker's listing
  • It is sold at 12 V and at 24 V.The maker's and dealers' listings
  • Sleipner also prints a second, lower thrust figure for when the battery sags under load: 110 lb at 10.5 V.The maker's published rating

What to weigh

  • The boat comes out of the water to fit it: it needs a tunnel bore below the waterline.The mounting: a bore through the hull, or a housing recessed into it

What the manual and listings say

This is the note we keep on the Sleipner SEP50/140S, written from the maker’s manual, its product pages and the dealer’s listing.

In the box: Proportional: the joystick sets how hard it pushes. The power controller (PPC) is included.

12 V

PRO means proportional: the joystick sets how hard it pushes. A 140 mm tunnel, the size between the 125 and 185 mm units.

24 V

The 24 V build of the 140 mm SEP50.

Videos

Two of Sleipner’s own videos, from its YouTube channel: how the tunnel mouth changes the thrust you get, and the current E-series tunnel units. They are the maker’s pitch. Watch them for what the unit looks like and how it goes in, and take any claim back to the figures above.

Sleipner’s own video, on Sleipner’s YouTube channel. The picture is a still from it.
Sleipner’s own video, on Sleipner’s YouTube channel. The picture is a still from it.

Other sizes and close alternatives

Sleipner also sells this thrust built another way. Each has its own page:

These are Sleipner’s next sizes in the same line, by thrust.

These are other makers’ units of the same style, for the same end, within a quarter of its published thrust. Each is that maker’s nearest match.

Compare them side by side

Every model with a page here is listed, maker by maker, on the thruster index.

Where to go next

The specs are the maker’s and the dealers’, on the dates shown. The sizing and the costs are our arithmetic, done without seeing your boat.